Design development/ECI

  • Early engagement to assist with design development, buildability and erection methodology.

  • Value management.

  • Preliminary costing to assist with clients tender.

Project Management

  •   Dedicated management team supported by project engineers, drafters, and estimators to co-ordinate the project from concept to hand-over.

  •   Active communication with the Client.

  •   Motivated and forward-thinking management style, operating in a pro-active manner to ensure all aspects of the project are delivered on-time and above Client’s expectations.

Drafting

  •   Detailed 3D modelling

  •   Complete shop drawings for review and construction

  • Incorporation of as-built survey data and architectural CAD files

Fabrication

  •  6000m2 factory under roof on a 4-acre site

  • 7 overhead gantry cranes capable of 30t lifting

  • Daito beam-line coping robot

  • OSMG shot blasting machine

  • Skilled team of boilermakers, welders & machine operators.

 

Installation

  •   Wide variety of lifting/rigging equipment

  •   Mobile cranage where required

  •   Access equipment

  •   Experienced team of steel erectors, riggers, and on-site boilermakers